The project includes main producing workshop and the auxiliary workshops.The main workshop equips with two tissue machine lines.The TM line is one layer headbox design.Pulping, stock peparation are arranged in the first floor and the tissue machine is arranged in second floor .The capacity is 60,000 Tons per year for a line,The total capacity is 120,000 tons per year