Install a new 30T / h gas-fired steam boiler and supporting facilities in a suitable location in the original factory.The new boiler is used as standby steam source and installs outdoor. The boiler is as to be temporary.
滬ICP備12023716號(hào) 2012 © China Haisum Engineering CO., LTD.
滬公網(wǎng)安備 31010402000905號(hào)